Project Info
Commissioning Segment
Commissioning
Market Segment
AviationLocation
DFW, TX
Description
This project included (10) air handling units, (37) fan coil units, (70) fan powered terminal units, (134) variable volume terminal units, (23) exhaust and ventilation fans, (22) radiant heaters, (4) grease waste pumps, and (7) sump pumps. In addition, we commissioned the Lighting Control System and Building Automation System. The chilled and heating water loop was also included in this scope. The loop comes into the terminal at a pump room served from the central utility plant which has tertiary pumps delivering chilled and heating water to the terminal air handling units.