Command Commissioning and the Energy teamed up to perform a survey and functional performance test of the twenty-six (26) Pre-Conditioned Air Systems (PCA), chilled water and heating water systems serving the units. The scope of work included coordinating with the facilities management group to test the operation of the units through the entire sequence of operation, and documenting deficiencies found. In addition, sensor calibration was verified, alarms were checked and the building automation system interface and graphics with the units were tested.
PROJECT TAGS
Airport Terminal
Aviation
Central Plant
Church
Commissioning
Continuous Commissioning
Energy Cost Savings
Facility Assessment
Facility Operations
High Reliable Commissioning
Hospital
Hotel
Laboratory/Research
Laboratory / Research Facility
LEED Commissioning
Mission Critical/Data Center
Mixed Use
Modeling/Optimization
Museum
Office Building
Parking Garage
People
Residential
Retail / Shopping Center / Restaurant
Richard-Tice
School